Value Proposition

  • New Plants
    • 3.5% lower capital cost
    • 4.5% lower energy cost (17 BTU/SCF H2)
  • 25% capacity upgrades
    • 85% lower capital cost
    • 5.1% lower energy cost (20 BTU/SCF H2)
  • 70% reduced reformer pressure drop where needed